When will we be able to switch the year in the beta version of connections without losing the ability to switch to prior years?
Currently the beta version of connections does not allow you to switch back and forth from 2014 to 2015. This has been an ongoing issues and I would like to know if or when it will be resolved. Thanks.
-
Greg,
The beta site does allow you to switch back and forth as of last Friday. However, you must have a new performance period set up for this year to get it all to work. Your site only had one performance period entered (1/1/2014 - 12/31/2014). I went in and added one for 2015.
So now, when you open the dashboard for any page, it will default to the current performance period (2015), and many of them will be entirely blank. You can then switch back to 2014 from the Periods dropdown.
Bryan
Please sign in to leave a comment.
Comments
1 comment