New and Updated Reports
New and Updated Reports:
Go to this link for an overview of the update to new reports which includes the screenshots: http://www.connectionsonline.net/docs/Update_to_COL_2-8-10.d oc
Updated Dialog Reports: The Dialog reports have been updated for all the tabs. The layout has been improved. On the Individual Dialog report, Performance Indicators are added, plus metrics and project tasks. New Dialog reports are found on the Reports module. Also, the old dialog reports remain within the Dialog edit window in the same location as before – in the upper right corner of the edit window. The new Dialog report icon can now also be found at the bottom on the Dialog edit window as a printer icon.
New Metric Report: The new metric report allows for a report to be printed for any metric from any metric module (Organization, Department, Project, or People tab). There is a printer icon found at the bottom of the metric edit window – click the print button and the report opens – use the print icon in the top left of the report to print.
Updated Resource Utilization Report: You will be able to sort on a number of dimensions. You will be able to sort by all departments, rolled up departments, or by a single department. You will also be able to sort by task, individual or not-grouped (in “not grouped” sort mode, you can sort using the report column headers.)
New All Projects Report: In this report, there is a list of all projects from all departments listed. The projects are grouped by status – i.e. all projects “current”, all projects “queued”, etc.
Please sign in to leave a comment.
Comments
0 comments