Project Linking
The name and dates cannot be changed on the linked project. The rest of the fields in the linked project’s top edit form CAN be changed on the linked project (color, status, phase, tracking field, can be changed on the linked project.) If the name or date changes on the original project, the changes will appear on the linked project.
Example: Project is originated by Org A
Project from Org A is linked to Dept B
Dept B cannot change the name or the dates on the linked project, but CAN change the other information (color, status, phase, tracking field, - DeptB can also “move” the linked project). When Org A changes the name and or dates of the original project, that change will show in the linked project on Dept B.
Summary
Fields that CANNOT be changed on a Linked Project: Name, Description, Dates, Hours, and all child modules (tasks,metrics,comments, etc.)
FIelds that CAN be changed on a LInked Project per instance: Tracking Label, Color, Priority, Phase, Rank, Location, and Status
Please sign in to leave a comment.
Comments
0 comments